[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Fw: Internal WG Review: Recharter of Common Control and Measurement Plane WG (ccamp)



FYI
----- Original Message ----- From: "IESG Secretary" <iesg-secretary@ietf.org> To: <iesg@ietf.org>; <iab@iab.org>; "Adrian Farrel" <adrian@olddog.co.uk>; "Deborah Brungard" <dbrungard@att.com>
Sent: Thursday, October 11, 2007 7:15 PM
Subject: Internal WG Review: Recharter of Common Control and Measurement Plane WG (ccamp)


A new charter for the Common Control and Measurement Plane (ccamp)
working group in the Routing Area of the IETF is being considered.
The draft charter is provided below for your review and comment.

The IETF Secretariat

+++


--------------------------------------------

Last Modified: 2007-10-05

Current Status: Active Working Group

Chair(s):
Adrian Farrel <adrian@olddog.co.uk>
Deborah Brungard <dbrungard@att.com>


Routing Area Director(s):
Ross Callon <rcallon@juniper.net>
David Ward <dward@cisco.com>

Routing Area Advisor:
Ross Callon <rcallon@juniper.net>

Technical Advisor(s):
Alex Zinin <zinin@psg.com>

Mailing Lists:
General Discussion: ccamp@ops.ietf.org
To Subscribe: majordomo@ops.ietf.org
In Body: subscribe ccamp
Archive: https://ops.ietf.org/lists/ccamp

Description of Working Group:

OLD
The CCAMP working group coordinates the work within the IETF defining
a common control plane and a separate common measurement plane for
physical path and core tunneling technologies of Internet and telecom
service providers (ISPs and SPs), e.g. O-O and O-E-O optical switches,
ATM and Frame Relay switches, MPLS, GRE, in cooperation with the MPLS
WG.

NEW
The CCAMP working group coordinates the work within the IETF defining
a common control plane and a separate common measurement plane for
physical path and core tunneling technologies of Internet and telecom
service providers (ISPs and SPs), e.g. O-O and O-E-O optical switches,
TDM switches, Ethernet switches, ATM and Frame Relay switches, IP
encapsulation tunneling technologies, and MPLS in cooperation with the
MPLS WG.

===

New paragraph in the list of Scope bullets.
Suggest to place it after:
"- Definition of MIB modules and other OAM techniques relevant to the
protocols and extensions specified within the WG."
and before:
"CCAMP WG currently works on the following tasks:"

- Work on traffic-engineering GMPLS mechanisms and protocol
extensions to support source-controlled and explicitly-routed
Ethernet data paths for Ethernet data planes that are already
approved by an SDO with responsibility for the Ethernet data
plane. It is expected that the primary SDO in this case is the
IEEE. Note that the specification or modification of Ethernet data
planes is out of scope.


===

Final paragraph

OLD
In doing this work, the WG will work closely with at least the
following other WGs: MPLS, ISIS, OSPF, IDR, L1VPN and PCE. The WG
will also cooperate with the ITU-T.

NEW
In doing this work, the WG will work closely with at least the
following other WGs: MPLS, ISIS, OSPF, IDR, L1VPN, and PCE. The
WG will also cooperate with the ITU-T and the IEEE 802.1.

===

Milestone revisions (see below for full revised milestone list)

OLD
Jan 2006 First version WG I-D for Protocol solutions for MLN/MRN
NEW
Sep 2007 First version WG I-D for Protocol solutions for MLN/MRN
---
OLD
Mar 2006 First version WG I-D GMPLS OAM Requirements
NEW
Sep 2007 First version WG I-D GMPLS OAM Requirements
---
OLD
Apr 2006 First version of WG I-D for additional MIB module to
cover RSVP-TE signaling extensions
NEW
Nov 2007 First version of WG I-D for additional MIB module to
cover RSVP-TE signaling extensions
---
OLD
Jun 2006 Submit Informational I-D for Analysis of inter-domain
issues for disjoint and protected paths for IESG review
NEW
Oct 2007 Submit Informational I-D for Analysis of inter-domain
issues for disjoint and protected paths for IESG review
---
OLD
Oct 2006 Submit MPLS to GMPLS migration strategies I-D for IESG
review
NEW
Sep 2007 Submit MPLS-TE to GMPLS migration strategies I-D for
IESG review
---
OLD
Nov 2006 Submit ASON Routing solutions I-D for IESG review
NEW
Jan 2008 Submit ASON Routing solutions I-D for IESG review
---
OLD
Dec 2006 Submit Requirements for Multi-Layer and Multi-Region
Networks I-D for IESG review
NEW
Oct 2007 Submit Requirements for Multi-Layer and Multi-Region
Networks I-D for IESG review
---
OLD
Jan 2007 Submit MPLS-GMPLS interworking requirements and
solutions I-D for IESG review
NEW
Sep 2007 Submit MPLS-TE/GMPLS interworking requirements I-D for
IESG review
---
OLD
Feb 2007 Submit Evaluation of existing protocols for MLN/MRN for
IESG review
NEW
Oct 2007 Submit Evaluation of existing protocols for MLN/MRN for
IESG review
---
OLD
Mar 2007 Submit OSPF-TE/GMPLS MIB module for MIB doctor and IESG
review
NEW
Dec 2007 Submit OSPF-TE/GMPLS MIB module for MIB doctor and IESG
review
---
OLD
Jun 2007 Submit GMPLS OAM Requirements I-D for IESG review
NEW
Feb 2008 Submit GMPLS OAM Requirements I-D for IESG review
---
OLD
Aug 2007 Submit Protocol solutions for MLN/MRN I-D for IESG
review
NEW
Mar 2008 Submit Protocol solutions for MLN/MRN I-D for IESG
review
---
OLD
Dec 2007 Submit MIB module for RSVP-TE signaling extensions for
MIB doctor and IESG review
NEW
Apr 2008 Submit MIB module for RSVP-TE signaling extensions for
MIB doctor and IESG review
---
OLD
Dec 2007 Recharter or close Working Group
NEW
Dec 2008 Recharter or close Working Group
---
NEW
Oct 2007 First version WG I-Ds for GMPLS source-controlled and
explicitly-routed Ethernet networks
---
NEW
Sep 2008 Submit protocol extensions for GMPLS source-controlled
and explicitly-routed Ethernet networks for IESG review

====

Goals and Milestones (full revised milestone list)

Done Post strawman WG goals and charter
Done Identify and document a limited set of candidate solutions
for signalling and for measurement. Among candidate control
solutions to be considered are the existing GMPLS drafts.
Done Build appropriate design teams
Done Submit WG document defining path setup portions of common
control plane protocol
Done Submit WG document defining common measurement plane protocol
Done Submit LMP MIB to IESG
Done Submit protection & restoration documents to IESG
Done Submit ASON signaling requirements doc to IESG
Done Submit GMPLS MIBs to IESG
Done Produce CCAMP WG document for generic tunnel tracing protocol
Done Produce CCAMP WG document for multi-area/AS signaling and
routing
Done Submit ASON routing requirements doc to IESG
Done Submit revised charter and milestones to IESG for IESG
consideration of more detailed deliverables and determination
of usefulness of continuation of WG
Done First version WG I-D for Advertising TE Node Capabilities in
ISIS and OSPF
Done First version WG I-D for Automatic discovery of MPLS-TE mesh
membership
Done Submit ASON Routing evaluation I-D for IESG review
Done Cross-WG review of I-D for Advertising TE Node Capabilities in
ISIS and OSPF
Done First version WG I-D MPLS to GMPLS migration strategies
Done First version WG I-D Requirements for Multi-Layer and Multi-
Region Networks
Done First version WG I-D for Evaluation of existing protocols for
MLN/MRN
Done First version of WG I-D for ASON Routing solutions
Done Submit RSVP-TE extensions for inter-domain signaling I-D for
IESG review
Done Submit Per-domain path computation signaling I-D for IESG
review
Done First version of WG I-D for OSPF-TE/GMPLS MIB module
Done Submit GMPLS signaling in support of Call Management I-D for
IESG review
Done First version WG Informational I-D for Analysis of inter-
domain issues for disjoint and protected paths
Done Submit I-D for Advertising TE Node Capabilities in ISIS and
OSPF for IESG review
Done Submit GMPLS/ASON lexicography I-D for IESG review
Done First version WG I-D MPLS-GMPLS interworking requirements and
solutions
Done Submit LSP Stitching I-D for IESG review
Done Submit I-D for Automatic discovery of MPLS-TE mesh membership
for IESG review
Done Submit GMPLS routing and signaling interoperability advice I-D
for IESG review
Sep 2007 First version WG I-D for Protocol solutions for MLN/MRN
Sep 2007 First version WG I-D GMPLS OAM Requirements
Sep 2007 Submit MPLS-TE to GMPLS migration strategies I-D for IESG
review
Sep 2007 Submit MPLS-TE/GMPLS interworking requirements I-D for
IESG review
Oct 2007 First version WG I-Ds for GMPLS source-controlled and
explicitly-routed Ethernet networks
Oct 2007 Submit Informational I-D for Analysis of inter-domain
issues for disjoint and protected paths for IESG review
Oct 2007 Submit Requirements for Multi-Layer and Multi-Region
Networks I-D for IESG review
Oct 2007 Submit Evaluation of existing protocols for MLN/MRN for
IESG review
Nov 2007 First version of WG I-D for additional MIB module to
cover RSVP-TE signaling extensions
Dec 2007 Submit OSPF-TE/GMPLS MIB module for MIB doctor and IESG
review
Jan 2008 Submit ASON Routing solutions I-D for IESG review
Feb 2008 Submit GMPLS OAM Requirements I-D for IESG review
Mar 2008 Submit Protocol solutions for MLN/MRN I-D for IESG review
Apr 2008 Submit MIB module for RSVP-TE signaling extensions for
MIB doctor and IESG review
Sep 2008 Submit protocol extensions for GMPLS source-controlled
and explicitly-routed Ethernet networks for IESG review
Dec 2008 Recharter or close Working Group