Hi,
As discussed at the meeting(s) we should consider a small recharter to
put the GELS work clearly in scope and to indicate that we will work
with IEEE 802.1 as necessary.
We should take the opportunity to rejig the milestones, but noting that
a bunch of (overdue) milestones are about to be completed it is moot
whether we should rearrange them all. Basically, I am too lazy to do
that and propose just to change the ones that are further out.
I would like to ask you all to look at this and comment. In particular:
are the document editors happy with these targets?
ADs - your opinions too, please.
The changes proposed are...
===
First paragraph
OLD
The CCAMP working group coordinates the work within the IETF defining a
common control plane and a separate common measurement plane for
physical path and core tunneling technologies of Internet and telecom
service providers (ISPs and SPs), e.g. O-O and O-E-O optical switches,
ATM and Frame Relay switches, MPLS, GRE, in cooperation with the MPLS WG.
NEW
The CCAMP working group coordinates the work within the IETF defining a
common control plane and a separate common measurement plane for
physical path and core tunneling technologies of Internet and telecom
service providers (ISPs and SPs), e.g. O-O and O-E-O optical switches,
TDM switches, Ethernet switches, ATM and Frame Relay switches, and MPLS
GRE, in cooperation with the MPLS WG.
===
Final paragraph
OLD
In doing this work, the WG will work closely with at least the following
other WGs: MPLS, ISIS, OSPF, IDR, L1VPN and PCE. The WG will also
cooperate with the ITU-T.
NEW
In doing this work, the WG will work closely with at least the following
other WGs: MPLS, ISIS, OSPF, IDR, L1VPN and PCE. The WG will also
cooperate with the ITU-T, and the IEEE 802.1.
===
Milestones (only those changed or new)
Aug 2007 First version WG I-D for Protocol solutions for MLN/MRN
Aug 2007 First version WG I-D GMPLS OAM Requirements
Sep 2007 Submit Informational I-D for Analysis of inter-domain issues
for disjoint and protected paths for IESG review
Sep 2007 Submit MPLS to GMPLS migration strategies I-D for IESG review
Sep 2007 Submit MPLS-GMPLS interworking requirements and solutions
I-D for IESG review
Sep 2007 First version WG I-Ds for control of Ethernet networks
Oct 2007 Submit Requirements for Multi-Layer and Multi-Region
Networks I-D for IESG review
Oct 2007 Submit Evaluation of existing protocols for MLN/MRN for IESG
review
Oct 2007 First version of WG I-D for additional MIB module to cover
RSVP-TE signaling extensions
Dec 2007 Submit OSPF-TE/GMPLS MIB module for MIB doctor and IESG review
Jan 2008 Submit ASON Routing solutions I-D for IESG review
Feb 2008 Submit GMPLS OAM Requirements I-D for IESG review
Mar 2008 Submit Protocol solutions for MLN/MRN I-D for IESG review
Apr 2008 Submit MIB module for RSVP-TE signaling extensions for MIB
doctor and IESG review
May 2008 Submit protocol extensions for control of Ethernet networks
for IESG review
Dec 2008 Recharter or close Working Group
====
Thanks,
Adrian
.