[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Proposed CCAMP recharter



adrian

couple of points on editorship:

- MRN req + eval. should imho be ready by end Aug.

- concerning the i/w document i'd like to suggest referring to MPLS-TE (rather than MPLS) since applying only to RSVP-TE

- also you refer to a solution for the latter but we just have req. and a framework since so far -> are u sure solution would be ready by Sep'07
or alternatively the former doc shall be split and further discussed

we need also a milestone for input to the MPLS security doc. but not sure this has to be recorded

concerning the charter, two specific comments

- like also mentioned during the second meeting, clarifying the term Ethernet types would be suggested otherwise entering in an open-ended discussion about what is allowed/not allowed, desired/not-desired, possible/not possible, etc. and probably focus on the analytical work here (something we should have probably done in the GELS context but did not happen) - side note here it was always felt useful to have operational use case described as well but that work did also never happen

- is this milestone also including Ethernet service signaling e.g. MEF ? in that case i would suggest to make a clear distinction here ?

thanks,
-d.

Adrian Farrel wrote:
Hi,

As discussed at the meeting(s) we should consider a small recharter to put the GELS work clearly in scope and to indicate that we will work with IEEE 802.1 as necessary.

We should take the opportunity to rejig the milestones, but noting that a bunch of (overdue) milestones are about to be completed it is moot whether we should rearrange them all. Basically, I am too lazy to do that and propose just to change the ones that are further out.

I would like to ask you all to look at this and comment. In particular: are the document editors happy with these targets?

ADs - your opinions too, please.

The changes proposed are...
===
First paragraph
OLD
The CCAMP working group coordinates the work within the IETF defining a common control plane and a separate common measurement plane for physical path and core tunneling technologies of Internet and telecom service providers (ISPs and SPs), e.g. O-O and O-E-O optical switches, ATM and Frame Relay switches, MPLS, GRE, in cooperation with the MPLS WG.

NEW
The CCAMP working group coordinates the work within the IETF defining a common control plane and a separate common measurement plane for physical path and core tunneling technologies of Internet and telecom service providers (ISPs and SPs), e.g. O-O and O-E-O optical switches, TDM switches, Ethernet switches, ATM and Frame Relay switches, and MPLS GRE, in cooperation with the MPLS WG.
===
Final paragraph
OLD
In doing this work, the WG will work closely with at least the following other WGs: MPLS, ISIS, OSPF, IDR, L1VPN and PCE. The WG will also cooperate with the ITU-T.

NEW
In doing this work, the WG will work closely with at least the following other WGs: MPLS, ISIS, OSPF, IDR, L1VPN and PCE. The WG will also cooperate with the ITU-T, and the IEEE 802.1.
===
Milestones (only those changed or new)

Aug 2007    First version WG I-D for Protocol solutions for MLN/MRN
Aug 2007    First version WG I-D GMPLS OAM Requirements
Sep 2007 Submit Informational I-D for Analysis of inter-domain issues for disjoint and protected paths for IESG review
Sep 2007    Submit MPLS to GMPLS migration strategies I-D for IESG review
Sep 2007 Submit MPLS-GMPLS interworking requirements and solutions I-D for IESG review
Sep 2007    First version WG I-Ds for control of Ethernet networks
Oct 2007 Submit Requirements for Multi-Layer and Multi-Region Networks I-D for IESG review Oct 2007 Submit Evaluation of existing protocols for MLN/MRN for IESG review Oct 2007 First version of WG I-D for additional MIB module to cover RSVP-TE signaling extensions
Dec 2007    Submit OSPF-TE/GMPLS MIB module for MIB doctor and IESG review
Jan 2008    Submit ASON Routing solutions I-D for IESG review
Feb 2008    Submit GMPLS OAM Requirements I-D for IESG review
Mar 2008    Submit Protocol solutions for MLN/MRN I-D for IESG review
Apr 2008 Submit MIB module for RSVP-TE signaling extensions for MIB doctor and IESG review May 2008 Submit protocol extensions for control of Ethernet networks for IESG review
Dec 2008    Recharter or close Working Group
====

Thanks,
Adrian



.