Re: question regarding inter-domain-pd-path-comp



Hi Faisal,

Thanks for your comments - see in line,

On Jan 17, 2006, at 8:32 AM, Faisal Aslam wrote:

Hi,
I have a question about that per-domain path computation and also want to indicate few minor mistakes in the draft. It important for me, that you answer my questions because I am middle of something.

*** Question

At page 7, case-1, when the next-hop is NOT present in TED and suppose that policy suggest to use stitching (or nesting), then why you cannot dynamically create H-LSP/S-LSP, after successfully finding domain exit-point using auto-discovery (with crankback), just like it is allowed to do this in case-2? Is it a writing mistake?

The confusion was probably cause by the format of the paragraph:

A 2) If the next-hop boundary LSR is present in the TED.

should actually read:

2) Once the next-hop boundary LSR has been determined (according to the procedure described in 1)) or if the next-hop boundary is present in the TED.

That will remove the confusion. Thanks.

** Comments About draft

T0 is named for inter-area LSP at page 6 but by mistake it is referred as T1 at 4.1.1 (page 10) and also at 4.1.2 (page 11). At both places it should be change with T0 because inter-AS is referred as T1. [RFC2702] not enlisted in the references at the end of draft but mention at page 5. [LSP-STITCHING] reference says “work under progress” it should be “work in progress” [LOOSE-REOPT] is written on page 13 but enlisted in references as (on page 17) as [LOOSE-PATH-REOPT] [LSP-HIER] reference mention draft-ietf-mpls-lsp- hierachy-“08.txt” . I think you should eliminate 08.txt, because draft number is not specified in other references. The [LSP- STITCHING] reference has similar problem. At page 10, while giving example 2 you write R0-X1-“ASR1”-ABR3. Here ASR1 should be ABR1. While explaining 4.1.1 Case1, you specify ABR1 without defining it first. I suggest that change following line. “R0 then computes the path to reach the selected next hop ABR and signals the path message” to “R0 then computes the path to reach the selected next hop ABR (ABR1) and signals the path message”
Thanks (all fixed).

JP.

Faisal Aslam